SHORING SYSTEMS
Skyway Canada Limited has been an innovator and leader in the shoring industry for over forty years. Skyway’s products are designed to help reduce costs and increase productivity. If your project has special requirements, Skyway can deliver custom solutions that meet your needs.
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
New Winnipeg Airport YWG, EllisDon Construction • Materials and labour for departure ramp and road • Peak labour: 52 carpenters
• 20 tractor trailer loads of High Strength Light Weight aluminium shoring • Challenges – small laydown yard, tight work schedules
Lions Gate Bridge, Vancouver BC • System Scaffold structure and containment for blasting & painting of Bridge steel • Total Scaffold height was over 300 ft. above Vancouver harbour waters
• Tower shown was at water’s edge in North Vancouver • Other tower on pier surrounded by water just offshore of Stanley Park’s
famous seawall • Aluminum Truss & Shoring supported platform provided protection above sidewalks,
bicycle paths & traffic lanes at all times • Project started Fall 2004 & finished Summer 2006
Lions Gate Bridge, Vancouver BC • System Scaffold structure and containment for blasting & painting of Bridge steel • Total Scaffold height was over 300 ft. above Vancouver harbour waters
• Tower shown was at water’s edge in North Vancouver • Other tower on pier surrounded by water just offshore of Stanley Park’s
famous seawall • Aluminum Truss & Shoring supported platform provided protection above sidewalks,
bicycle paths & traffic lanes at all times • Project started Fall 2004 & finished Summer 2006
Lions Gate Bridge, Vancouver BC • System Scaffold structure and containment for blasting & painting of Bridge steel • Total Scaffold height was over 300 ft. above Vancouver harbour waters
• Tower shown was at water’s edge in North Vancouver • Other tower on pier surrounded by water just offshore of Stanley Park’s
famous seawall • Aluminum Truss & Shoring supported platform provided protection above sidewalks,
bicycle paths & traffic lanes at all times • Project started Fall 2004 & finished Summer 2006
Lions Gate Bridge, Vancouver BC • System Scaffold structure and containment for blasting & painting of Bridge steel • Total Scaffold height was over 300 ft. above Vancouver harbour waters
• Tower shown was at water’s edge in North Vancouver • Other tower on pier surrounded by water just offshore of Stanley Park’s
famous seawall • Aluminum Truss & Shoring supported platform provided protection above sidewalks,
bicycle paths & traffic lanes at all times • Project started Fall 2004 & finished Summer 2006
Lions Gate Bridge, Vancouver BC • System Scaffold structure and containment for blasting & painting of Bridge steel • Total Scaffold height was over 300 ft. above Vancouver harbour waters
• Tower shown was at water's edge in North Vancouver • Other tower on pier surrounded by water just offshore of Stanley Park’s
famous seawall • Aluminum Truss & Shoring supported platform provided protection above sidewalks,
bicycle paths & traffic lanes at all times • Project started Fall 2004 & finished Summer 2006
Lions Gate Bridge, Vancouver BC • System Scaffold structure and containment for blasting & painting of Bridge steel • Total Scaffold height was over 300 ft. above Vancouver harbour waters
• Tower shown was at water's edge in North Vancouver • Other tower on pier surrounded by water just offshore of Stanley Park’s
famous seawall • Aluminum Truss & Shoring supported platform provided protection above sidewalks,
bicycle paths & traffic lanes at all times • Project started Fall 2004 & finished Summer 2006
Encana Foster Creek, AB. • Typical Skyway Oil Sands Project • 110 Men • 2.8MM in Equipment
• Construction, maintenance and shutdowns • On site since 2005
Encana Foster Creek, AB. • Typical Skyway Oil Sands Project • 110 Men • 2.8MM in Equipment
• Construction, maintenance and shutdowns • On site since 2005
Encana Foster Creek, AB. • Typical Skyway Oil Sands Project • 110 Men • 2.8MM in Equipment
• Construction, maintenance and shutdowns • On site since 2005
Encana Foster Creek, AB. • Typical Skyway Oil Sands Project • 110 Men • 2.8MM in Equipment
• Construction, maintenance and shutdowns • On site since 2005
Lions Gate Bridge, Vancouver BC • System Scaffold structure and containment for blasting & painting of Bridge steel • Total Scaffold height was over 300 ft. above Vancouver harbour waters
• Tower shown was at water's edge in North Vancouver • Other tower on pier surrounded by water just offshore of Stanley Park’s
famous seawall • Aluminum Truss & Shoring supported platform provided protection above sidewalks,
bicycle paths & traffic lanes at all times • Project started Fall 2004 & finished Summer 2006